小12萝裸体洗澡加自慰|日韩高清无码国产|国产91视频在线观看|亚洲日本天堂在线|精品国产精品三级精品AV网址|国产免费观看久久久|日韩人妻无码精品久久|非洲黑人最猛性xxxx交

歡迎光臨我們的網(wǎng)站!公司簡介 | 聯(lián)系我們

質(zhì)邦閥門-專業(yè)生產(chǎn)加工、定做各種船用閥門和附件

上海質(zhì)邦閥門制造有限公司
全國服務(wù)電話 全國服務(wù)電話 021-61553650
產(chǎn)品展示
聯(lián)系我們
全國服務(wù)電話:021-61553650

傳真:021-61553650

手機(jī):13788995407

郵箱:sales@sh-zbfm.com

地址:上海市寶山區(qū)寶楊路1800號(hào)

708所“精銦一號(hào)”正式交付自升式風(fēng)電安裝平臺(tái)
發(fā)布時(shí)間:2017-05-22 12:18 來源:未知
In May 18, 2017, the "refined indium 1" held a delivery ceremony in Guangzhou Nansha jack up wind power installation platform, the platform is designed by seven ships of the O eight R & D, the first KOE01 shipbuilding group Whampoa  Wenchong ship Co., Ltd. Guangdong fine indium ocean engineering Limited by Share Ltd to build the jack up wind electrical installation platform. Seven, O eight deputy director Li Xiaoping, vice chief engineer dragon attended the delivery ceremony. The ship is another masterpiece of the Dragon Master studio.
Seven O eight, "refined indium No. 1" delivered by self elevating wind power installation platform
It is reported that the "refined indium 1" platform is built for installation and maintenance design for each wind farms along the coast of China, the maximum operating depth of 45 meters, equipped with a 800 ton crane revolving around the pile and four sets of JYM-HJ3600 hydraulic bolt type continuous lifting system, can 7MW offshore wind turbine installation of the new generation the construction ability of 650 tons of single pile of pile foundation.MARINE VALVE abyc.com.cn
The platform will be at the end of May in the Jiangsu coastal wind farm was officially put into use, at least a year for China's offshore wind power with 200 thousand kilowatts of new installation service.
Seven O eight, "refined indium No. 1" delivered by self elevating wind power installation platform
In recent years, seven O eight has made technical breakthroughs in the design of offshore wind power platform, and has successfully delivered 3 type 3 wind power installation ships, and 4 type 5 wind power installation platforms are under construction.
Wind power installation vessel with bottom function from the early, to jack up wind power installation platform, and then to the self lifting self-propelled wind power integration platform at present, have better service to customers in the market, leading the technology development trend.MARINE BUTTERFLY VALVE abyc.com.cn
Seven O eight, "refined indium No. 1" delivered by self elevating wind power installation platform
Through continuous innovation, seven O eight currently has a lifting capacity of 250 tons, 350 tons, 500 tons, 800 tons, 1000 tons and 1200 tons of wind power installation vessel series ship research and development capabilities, achieve full coverage of the wind power installation vessel mainstream ship type, the formation of such products of independent design ability.
In 2009, the offshore wind power was still in its infancy in China. The seven O eight designed the 350 ton ocean No. 36 sitting bottom type and 250 ton ocean No. 38 self elevating type two wind power installation ship for Nantong ocean water construction.
Seven O eight, "refined indium No. 1" delivered by self elevating wind power installation platform船用蝶閥abyc.com.cn
Will ship this month to the end of the "Three Gorges ship Fu" in loading, navigation, dynamic positioning, lifting capacity, lifting capacity plays and structure design have reached or exceeded the domestic operating level of products.

title="小12萝裸体洗澡加自慰|日韩高清无码国产|国产91视频在线观看|亚洲日本天堂在线|精品国产精品三级精品AV网址|国产免费观看久久久|日韩人妻无码精品久久|非洲黑人最猛性xxxx交|精品熟女一区二区三区免费视频|免费观看成人电影|激情爆乳一区二区三区|国产午夜在线小视频">